Protocol effective dates are postponed, check the list

According to the exempt resolution 32345 dated 09 April of the current year in relation to the current state of the country, the Superintendence has decreed to postpone some test protocols that were planned for this year.

Attached is the list of products and new entries into force:

PROTOCOL 2020 POSTERGATION - REX 32354 from 09-04-2020
Protocol ProductDate 2020New date 2021
COMBUSTIBLE AREA
PC 21:2018Manually operated valves for portable LPG cylinders of 33 and 45 kg31-May28-Feb
PC 29/1:2018Central heating boilers using gaseous fuels1st June1st June
PC 29/1-2:2018Central heating boilers using gaseous fuels1st June1st June
PC 115/1:2019Electric generators or electrogenic groups that work with liquid fuels1 - Dec and 1 - Jun/211 June and 1 December
PC 36/1:2019Non-metallic hoses, with metal threaded connectors ...up to 35KW30-Nov and 31-May/2131- May and 30 -Nov
PC 7/1:2019Domestic cooking appliances using gaseous fuels23-Dec30-Jun
PC 11/1:2019Transportable and rechargeable cylinders23-DecSept. 23
PC 81/2:2019NG pressure regulators for pressures between 5bar and 100bar23-Dec and 23-Jun/2130-Jun and 31-Dec
LIGHTING AREA
PE 5/6-2:2018Fluorescent lamps with built-in ballast for general lighting30 -sept.30-Jun.
PE 5/17-2:2018LED lamps with built-in ballast for general lighting30 -sept.30-Jun.
PE 5/28-2:2019Fluorescent lamps with single socket30 -sept.30-Jun.
PE 5/29-2:2019Fluorescent lamps with double socket30 -sept.30-Jun.
PE 5/26:2019Night luminaires, mounted on plugs (Spacers)31- Dec and 30-Jun/2130-Jun and 31-Dec
AREA MBT
PE 3/6:2018Differential switch, unprotected, independent of voltage30-nov.31-ag.
HOME APPLIANCES AREA
PE 1/35:2019Surface cleaning appliances for domestic use, using steam30-Nov and 31-May/2131- maA12:D21y and 30 -nov